Overview
Reconstruction of existing asphalt pavement to concrete pavement, including sidewalk along the corridor
Owner: FDOT – Tampa Construction
GC: Ty Lin International
Cost: $11,107,155.93
Completed: 2016
Reconstruction of existing asphalt pavement to concrete pavement, including sidewalk along the corridor
Owner: FDOT – Tampa Construction
GC: Ty Lin International
Cost: $11,107,155.93
Completed: 2016