Overview
Reconstruction and widening of roadway, construction of a closed storm drain collection system, sidewalk on both sides of the roadway, reconstruction of signalized intersections, upgrade median openings, lighting, signing & pavement marking.
Owner: FDOT – Tampa Operations
GC: NV5, Inc.
Cost: $27,852,562.39
Completed: 2019